The project is an extension of Incheon Metro Line 1 in ROK. Upon completion, it will help the development of the new urban area of Gyeongdan, enhance the surrounding transportation network and improve the efficiency of public transport in Incheon. With stable performance, the belt conveyor of CREG has a fault rate of less than 1% under high‑intensity construction. With an average daily operation time of 16 hours, it successfully completes the material transportation task through high‑quality localization services.

After‑sales service engineer inspects continuous belt conveyor.

Adjustable idler frames are used for small‑turn curves.

PARAMETER

Transportation volume: 500t/h
Haul distance: 1,300m
Belt speed: 0.315m/s
Drive power: 220kw
Belt width: 800mm
Belt strength: EP200

PROJECT FEATURE

Passing through a turning route in the initial stage of TBM
The initial slag discharge of TBM enabled by continuous belt conveyor
Considering the two tunnels on both sides, the belt conveyor is disassembled and assembled twice to complete tunnel connection