Luoyang Xin’an Water Diversion Project
Luoyang Xin’an Water Diversion Project
Luoyang Xin’an Water Diversion Project
Two TBMs serve welfare project
The project is to connect Guxian Reservoir and Xin’an new waterworks through pipe and tunnel with a total length of 21.167 kilometers, among which the tunnelling length is 18.65 km long. In order to shorten the tunnel construction period, two sets of Φ 3.83 m EPB TBM were adopted to bore towards each other from the inlet and outlet respectively.
Project Background
The project has provided Xin’an County with a stable, reliable and high-quality water source, enhancing the security and reliability of urban water supply. It has offered a powerful water resource guarantee for the economic and social development of Xin’an County, and promoted the development of local industries.
right side
Luoyang Xin’an Water Diversion Project Route
CREG service team is busy with TBM commissioning before launching.
Project Information
| Tunnelling length: | 18,652 m |
| Geology: | Clay, sandstone, gravelly stone |
| Contractor: | Henan Water Construction Construction Co., Ltd. |
TBM Parameter
| TBM type: | EPB TBM |
| TBM S/N: | CREC 635, CREC 636 |
| Boring Dia: | 3.83 m |
| Main drive power: | 1000 kW |
| FAT date: | September, 2021 |
| Best performance: | 626.4 m per month, 31.2m per day. |
Project Characteristics
| Buried depth of the tunnel is up to 161 meters. |
| The tunnel is rather long, and one of the TBMs has completed over 10 kilometers long tunnelling. |
| The tunnel construction is faced with complex hydro-geological conditions like high water level and existence of fracture zones. |