Continuous Conveyor Project for Lot 2/5 of Yangtze River Diversion Project to Replenish Hanjiang River
The Yangtze River diversion project to replenish the Hanjiang River provides an important follow‑up water source for the Middle Route Project of the South‑to‑North Water Diversion, aiming at diverting water from the Yangtze River to the Hanjiang River to ensure ecological, industrial and agricultural water for the middle and lower reaches of the Hanjiang River. The project has long lines, large overburden and complex geological conditions. The project is of great significance in enhancing the water resources allocation capacity of the Hanjiang Basin and in improving the stability of water supply in northern water receiving areas.
To meet the special requirements of the project, CREG customized the design and production of belt conveyors to handle different gradients and turning radii, successfully meeting the material transportation needs of each construction stage of the project, demonstrating its strong customized service capacity, and further consolidating its leading position in the field of large‑scale water conservancy engineering material transportation.
Ultra‑long continuous belt conveyor boosts the construction of the Yangtze River Diversion Project.
Ultra‑long continuous belt conveyor boosts the construction of the Yangtze River Diversion Project.
PARAMETER
Continuous conveyor
| Transportation volume: | 300t/h |
| Haul distance: | 2,600m |
| Belt speed: | 0.315m/s |
| Drive power: | 250kW |
| Belt width: | 800mm |
| Belt strength: | ST800 |
Vertical belt conveyor
| Transportation volume: | 600t/h |
| Haul distance: | 50m |
| Belt speed: | 0.215m/s |
| Drive power: | 250kW |
| Belt width: | 1,600mm |
| Belt strength: | ST1250 |
PROJECT FEATURE
| Long‑distance transportation with multi‑point drive mode |
| Hanging fuselage structure is adopted, which is easy to install and remove |
| Long‑span truss outside the tunnel with a maximum span of 50m |