For the Lanzhou Water Source Project, China supplies water from the Liujiaxia Reservoire to Lanzhou City. The TBM tunnel is approximately 24,400m long with a maximum overburden of 918m and high‑strength rocks. The TBM was launched on the 4th of February 2016 in Gansu Province and completed tunnelling on the 2nd of February 2018.

Project Information

Tunnel type Water diversion tunnel
Tunnel length 14,000m
Geology Quartz schist, quartz diorite, granite
TBM supplied CREC‑241
Boring dia. 5.48m
Main drive power 1,800kW
TBM ex works Jan. 2016
Best performance 800.3m/month