Yuen Long South Open Channel Reconstruction Project in Hong Kong
Innovative Tunnelling Technology Supporting Utility Tunnel Construction
The BC04 section of the box culvert laying project for the reconstruction of the Yuen Long South Open Channel in Hong Kong includes a box culvert cross‑section measuring 4.85m in width and 6.65m in height, with a segment ring width of 2m. The construction employed a CREG U‑shaped Open‑type TBM. The equipment combines the mobile support technology of a shield tunneling machine with the precision assembly technology of an erecting machine to achieve integrated control over various processes, including foundation pit support, excavation, equipment jacking, box culvert erection, and synchronous road surface backfill and restoration. Compared to traditional construction methods, the U‑shape Open‑type TBM significantly reduces on‑site labor by 60%, saves 25% in land width, minimizes construction vibration and noise, and exerts minimal impact on the surrounding environment.
Project Background
In response to the limitations of traditional utility tunnel construction methods, which often involve complex procedures and low efficiency, CREG has integrated new concepts, technologies, and specialized equipment from both domestic and international sources. This initiative aims to develop a system for intelligent, low‑carbon, and mechanized prefabricated utility tunnel technology.
South Open Channel Reconstruction Project Route in Yuen Long, Hong Kong
The project has created a new method of construction for open‑cut tunnels.
The machine and new construction method have attracted extensive attention.
Project Information
| Project type: | open channel reconstruction, box culvert laying |
| Tunneling length: | 1000m |
| Geology: | silty clay, containing soft sand |
| Contractor: | China Railway Group Limited Consortium |
Parameters
| Machine type: | U‑shape Open‑type TBM |
| Machine S/N: | CREC 1508 |
| Maximum applicable longitudinal slope: | 5% |
| Maximum applicable cross slope: | 2% |
| Launch time: | March 2025 |
Project Characteristics
| It features control over excavation posture during operations with a small turning radius (R220m); |
| Construction is carried out in water‑rich soft ground; |
| Pressure control is sustained under conditions of unbalanced groundwater and earth pressure. |