Chongtai (Chongming-Taicang) Yangtze River Tunnel of Shanghai-Chongqing-Chengdu high-speed Railway
Chongtai (Chongming-Taicang) Yangtze River Tunnel of Shanghai-Chongqing-Chengdu high-speed Railway
11.325km-Long Single-heading Excavation
The total length of the Chongtai Yangtze River Tunnel is 13,201 m. It mainly passes through silt, silty clay, muddy soil and sand layers. The horizontal alignment includes three curve sections, and the vertical alignment includes five curve sections, with radii of 4,000m, 8,000m and 10,000m. A "V-shaped" longitudinal profile is adopted, with a maximum gradient of 25%. At its lowest point,the tunnel overburden is approximately 74.5m. The max. water and earth pressure reaches 9.6 bar.
This TBM is recognized within the industry as a "four-aside TBM" and achieves an intelligent tunneling mode of "manned supervision with unmanned operation."
Project Background
The commencement of construction on the Shanghai-Nanjing section is of great significance for supporting the national strategy of the Yangtze River Economic Belt, optimizing the spatial layout of the Yangtze River Delta, and accelerating the integration of Shanghai, Jiangsu and Anhui.
right side
Chongtai Yangtze River Tunnel Route
TBM Factory Acceptance Test
Project Information
| Tunnelling length: | 13,200 m |
| Geology: | silty clay, fine sand, coarse sand, medium sand and low-gas strata |
| Contractor: | China Railway Tunnel Group Co., Ltd. |
TBM Parameter
| TBM type: | Mega Sized Slurry TBM |
| TBM S/N: | CREC 1398 |
| Boring Dia: | 15.4 m |
| Main drive power: | 4900kW |
| FAT date: | January, 2024 |
| Best performance: | 30 m per day, 718 m per month |
Project Characteristics
| High water pressure sealing and muck discharge with the slurry circulation system |
| Challenges in the reliability of super-long-distance construction equipment |
| Construction in low-gas strata |