Luoning Pumped Storage Power Project
Luoning Pumped Storage Power Project
Luoning Pumped Storage Power Project
Challenging unprecedented 39°upward tunnelling
This project take the lead in optimizing the upper inclined shaft for water diversion, the middle adit and the lower inclined shaft into a first-level inclined shaft plan, thus creating a new model for the construction of shafts in pumped storage power stations in China.
Project Background
The breakthrough of the inclined shaft for the water diversion of the pumped storage power station has refreshed a new record for the mechanized construction in the field of pumped storage power station construction in China, and witnessed the birth of a new model for the fully mechanized cross-section excavation of inclined shafts in China.
right side
Vertical section of Luoning Pumped Storage Power Project
The project has created a new method of construction of pumped storage power station.
Large gradient has posed numerous difficulties to TBM tunnelling.
Project Information
| Tunnelling length: | 1,800 m |
| Geology: | Moderately weathered granite, fault fracture zone |
| Contractor: | Sinohydro Bureau 6 Co., Ltd. |
TBM Parameter
| TBM type: | Inclined Shaft TBM |
| TBM S/N: | CREC 1158 |
| Boring Dia: | 7.23 m |
| Main drive power: | 2,800 KW |
| FAT date: | August, 2022 |
| Best performance: | 22.75 m per day, 332 m per month |
Project Characteristics
| Tunnelling in large gradient - 38.742° upward |
| Dual anti-rolling-back system |
| Special muck chute for safe and efficient muck transfer |
| Limited space for TBM assembly at job site. |