Luoning Pumped Storage Power Project

Challenging unprecedented 39°upward tunnelling

This project take the lead in optimizing the upper inclined shaft for water diversion, the middle adit and the lower inclined shaft into a first-level inclined shaft plan, thus creating a new model for the construction of shafts in pumped storage power stations in China.

Project Background

The breakthrough of the inclined shaft for the water diversion of the pumped storage power station has refreshed a new record for the mechanized construction in the field of pumped storage power station construction in China, and witnessed the birth of a new model for the fully mechanized cross-section excavation of inclined shafts in China.

right side

Vertical section of Luoning Pumped Storage Power Project

The project has created a new method of construction of pumped storage power station.

Large gradient has posed numerous difficulties to TBM tunnelling.

Project Information

Tunnelling length: 1,800 m
Geology: Moderately weathered granite, fault fracture zone
Contractor: Sinohydro Bureau 6 Co., Ltd.

TBM Parameter

TBM type: Inclined Shaft TBM
TBM S/N: CREC 1158
Boring Dia: 7.23 m
Main drive power: 2,800 KW
FAT date: August, 2022
Best performance: 22.75 m per day, 332 m per month

Project Characteristics

Tunnelling in large gradient - 38.742° upward
Dual anti-rolling-back system
Special muck chute for safe and efficient muck transfer
Limited space for TBM assembly at job site.